Rationale for a Feasibility and Schematic Design Study
 Town Meeting November 15 at GMHS 7:00pm

Rationale for a Feasibility and Schematic Design Study
for the Penn Brook School

Although Penn Brook is currently safe for students and minor repairs have been made over the years, a construction project is needed for the following reasons.

Penn Brook School has an aging physical structure
  • The rubber membrane roof needs to be replaced
  • The roof has a dangerous slope that causes snow and ice to slide off and dump onto pathways leading into the school, in front of emergency exits and blocks fresh air intakes
  • All windows are single pane with deteriorating frames that must be replaced
  • Interior and exterior doors must be replaced
  • Handicap accessibility is not available in some places
  • Utility costs are higher due to inefficiencies
  • The original rubber gym floor is splitting which poses a safety issue, the majority of the
     flooring throughout the building is original
  • Several roof beams rest upon the concrete walls rather than on independent support beams that run directly down into the foundation, in violation of current building codes
Lack of space
  • Some spaces not designed for classroom use and closets have been converted into classrooms
  • Teachers have restrictions on their curriculum when they are forced to teach in substandard spaces that are not intended for current use
  • There is a lack of room in the classrooms for technology workstations and learning centers to support the curriculum
  • Classroom spaces are smaller than required by current codes and 23% smaller than MSBA standards
Electrical Issues
  • The service must be increased and enhanced to handle the additional demands of a 21st century school and the technology that accompanies it.
  • New energy efficient lighting and new safety lighting is needed throughout the building
  • Lack of an up to date security system
  • The clock system has failed
HVAC/Plumbing
  • With the exception of one boiler just replaced, the entire heating and ventilation system needs to be replaced
  • Hot water system is original to the building and must be replaced
  • The bathrooms and fixtures in the building are non-accessible and non-water conserving, and must be replaced to meet current codes and regulations. Any emergency repairs will require sinks and toilets to be brought up to code.
  • Due to the aging plumbing repairs are needed more frequently and at a higher cost.

 